Scope of work: Implementation of the infrastructure in the second industrial city in Asir. The scope consists of (road and lighting network – medium voltage network – communication network – a network that adds torrents – the drainage network – the treated water network and irrigation – the drinking water network).
Project duration: 36 Months
Status: In progress
Project value: 193,838,477.50