Modification of the soil shoulders for the iron line No. (1) between Al-Hofuf and Riyadh
Owner: Railways General Authority Duration of the project: – Status: Under Construction The value of the project: SR 28.696.678.74
Construction of a concrete bridge 196 km on the railway line
Owner: Railways General Authority Duration of the project: – Status: Completed The value of the project: SR 17,725,385
Construction of a concrete bridge (41/42) km on the double railway line 1-2
Owner: Railways General Authority Duration of the project: – Status: Under Construction The value of the project: SR 14,158,622